Eaton.com      EatonElectrical.com      Eaton-HighPowerTestLabs.com 

Eaton Logo                
General Capabilities Quality Lab Layout Directions Contact Conditions
For Tests
Rates

Capabilities

   High Power Lab

Phase

Voltage

Current 

Duration (cycles)

1 or 3

240 V

10 - 100 

60

1 or 3

240 V

10 - 200

10

1 or 3

480 V

10 - 65

180

1

480 V

10 - 200

10

3

480 V

10 - 150

10

1 or 3

600 V

10 - 65

180

1 or 3

635 V

10 - 200

10

1 or 3

725 V

10 - 65

60

1 or 3

1200 V

Contact us

Contact us

DC

Contact us

Contact us

Contact us

Maximum available currents at any voltage are limited to 125 MVA single phase and 250 MVA three phase. Time duration shown is for the listed maximum current. Times of 10 cycles to 4 seconds are common permissible time duration, for each test must be evaluated separately. 

   Low Power Lab

Phase

Voltage

Current 

Max Duration (cycles)

1 or 3

60 V

10A -  6kA

10 

1 or 3

120 V

10A - 10kA

10 

1 or 3

240 V

10A - 14kA

10 

1 or 3

480 V

10A - 14kA

10

1 or 3

600 V

10A - 14kA

10

1 or 3

725 V

10A - 6kA

10

1 or 3

1000 V

10A - 6kA

10

DC

46 VDC

10A - 4kA

166.67 mS

DC

 700 VDC

50A - 10kA

166.67 mS

DC

1000 VDC

65A - 6kA

166.67 mS

 
Thermal and Magnetic Calibration - 4 test stations available

Phase

Voltage 

Current 

Duration (cycles)

1

< 15

1A - 8kA

80

1 or 3

< 15

1A – 10 kA

Continuous 


Dielectric Strength - Up to 5kV AC
AC Temperature Rise - Up to 10,000A (1 and 3 Phase)
 
Other Equipment / Facilities:
Thermal Ambient Room (20C°- 50C° - 93” wide, 107” high entrance, room is 12’ wide and 16’ deep)
Data logger available to plot data on spreadsheets 
Fiber optic data acquisition system
Color High Speed Video (2 week notice required)
Digital Camcorder
Digital Camera
Digital Inductance Bridge 
Digital Low Resistance Ohm Meter
Conditioning Oven (25 -750 degrees Celsius)
Complete machine shop area capable of basic repairs and simple on-site modifications.
Fork lifts with 5 ton and 2 ton capacity
Conference room with audio and video equipment

Note: All equipment used to acquire test results are traceable to the National Institute of standards and technology and calibrated by an ISO/IEC 17025 accredited vendor. Certificates of calibration are available upon request. The calibration period for all devices is one year.


Copyright ©2011 Eaton Corporation. All rights reserved. The content of this Web site may not be copied, replaced, distributed, published, displayed, modified or transferred in any form or by any means except with the prior written permission of Eaton Corporation ("Eaton"). Copyright infringement is a violation of federal law subject to criminal and civil penalties.


Our Company
About Us
Careers
Doing Business

Ethics & Compliance

Investor Relations
News & Events
Eaton on Facebook Eaton on Facebook
Eaton on Twitter Eaton on Twitter
 Eaton on LinkedIn Eaton on LinkedIn
Eaton Newsfeeds Eaton Newsfeeds